Washburn CSO Control Project – Springfield, MA

Project Description:

This project consisted of numerous stormwater drainage improvements and separation of the City’s existing combined sewer system in the North End of Springfield, MA. Unique construction elements include a 60 inch pipe jacking beneath a rail road, slip-lining an existing 84-inch combined sewer, installation of 24 through 48 inch RCP storm drain, rehabilitation of a 66-inch brick sewer pipe, water mains, and other associated elements.